nigel

Technical Assistance for the Supervision of Construction of Ordu Waste Water Treatment Plant (WWTP) and Retrofitting of Kumbaşı WWTP

The overall objective of the project is to accelerate Turkey’s accession to EU by enabling Turkey to achieve a high level of environmental protection and compliance with the EU wastewater sector directives. The specific aim of this project is to protect the Black Sea from the negative effects of the raw wastewater discharge by establishing a sound wastewater management system to the Municipality of Ordu in accordance with EU and Turkish Legislation.

Expected results of the project are ensuring technical and physical quality of WWTP project according to European standard by providing technical assistance in the form of Supervision of the construction of the Ordu WWTP project, enabling Ordu Municipality to manage the project implementation through provision of training and support in management of the project implementation and enabling Ordu Municipality to establish and operate the water and wastewater system as an autonomous department with transparent accounts according to international accounting standards and with efficient operational and financial management standards.

The project is concerned with the procurement of a range of technical assistance services  such as the preparation of designs and full tender documents to Ordu Municipality for the rehabilitation and renewal of water (123 km) and waste water (60 km) networks as well as new storm water lines (80 km), detection of leaks and illegal connections and capacity building for the establihment and operation of a semi-autonomous water utility department with transparent accounts in accordance with international accounting standards and with efficient operational and financial management techniques.  Wi thin the scope of the project, various trainings are to be delivered to Municipality staff to improve their professional and technical capacities and to provide assistance for the preparation of suppkly tender documents for the necessary equipment.  Construction supervision services for Ordu Waste Water Treatment Plant (213.000 p.e), Water (57 km) and Wastewater (30 km) networks will also be provided under two separate FIDIC contracts.


   
SeptemberOctober 2018November
SunMonTueWedThuFriSat
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7
8
9
10
Copyright 2018 by DotNetNuke Corporation Privacy Statement Terms Of Use